IVCase study · Astoria, Queens

KORA Astoria

A ground-up condominium in Astoria, Queens. A sleek white façade drawing on the neighborhood’s Greek heritage; entitled and filed by the firm, now in interior finishes and reported to partners every quarter since 2024.

A ground-up condominium of six residential floors with private terraces, backyards and a rooftop cabana level. Construction began in 2024; completion is expected in late 2026, with marketing to begin before the building is finished.

AcquiredFiledUnder constructionSelloutStabilized
StatusUnder construction · interior finishesExpected completionLate 2026
Ground-upCondominium
6Residential floors
2024Construction start
Late 2026Expected completion
9Quarterly reports issued
IV.A · Drawing to building

The front elevation, the rendering, the site.

Scroll: the drawing filed with the city, the façade as designed, and the building as it stood in the second quarter of 2026.

Front elevation · filed drawingRendering · as designedSite · Q2 2026
IV.B · Six stages, one site

Where the project stands, stage by stage.

Three stages complete, one in progress, two ahead. Each row opens the stage page.

IV.C · The residences

As designed: the entrance, the lobby, the yards, the residences.

Renderings of the building as designed. Representative and subject to change.

Entrance · 31st Avenue
Lobby
Primary bath
Townhouse living room, toward the private yard
Residence 3A at dusk
Townhouse private yard
Penthouse duplex stair
Penthouse primary bedroom, walk-through closet and bath
IV.D · Plates

Seven plates, efficient layouts, private outdoor space.

Ground-floor residences with yards, terrace floors above, two penthouse levels and a cabana roof. Move down the building.

Filed floor plans · representative, subject to change
IV.E · Materials

Modern, sophistication, elegance.

A white façade outside; a restrained palette inside, selected and specified before the first drawing was filed.

Polished concreteLobby
Granite cobblestoneEntry paving
Calacatta marbleKitchens and baths
White oakFloors
Glazed ceramicWet areas
GravelRear yards
IV.F · Reported quarterly

What was done, what was planned, what rolled.

Each quarter’s report to partners states the quarter’s work, the next quarter’s plan and anything that moved — in the same format since the second quarter of 2024.

Quarterly report · same format since Q2 2024
Q4 2025

Structure

Structural top-out reached. Roofing and elevator bulkhead installed. Interior framing to the sixth floor; plumbing, sprinkler and MEP rough-ins advancing; elevator and windows in fabrication.

Q1 2026

Roughing and MEP

Scaffolding erected for roof, enclosure and façade work. HVAC, fire alarm, power, low-voltage and electrical distribution complete building-wide; sewer and water taps connected. Drywall, insulation and fireproofing underway.

Q2 2026

Enclosure

Wall systems, waterproofing and stucco cladding substantially complete; window systems pending delivery. Elevator installation commenced. Units drywalled, taped and insulated; bath and floor tile in progress.

Q3 2026 · planned

Windows, elevator, finishes

Install the window systems and complete the façade coating. Complete and inspect the elevator. Advance flooring, fixtures, cabinetry, appliances and paint across units and common areas.

Where a quarter’s plan rolled — windows forecast for Q2, delivered in Q3 — the report says so.

IV.G · Next

Marketing begins before the building is finished.

Continue

Sales, before completion

How YC Real Estate takes a building to market while it is still under construction — launch calendar, three languages, offer to closing.

Project facts from the firm’s quarterly reports to partners. Renderings and drawings are representative and subject to change; site photography Q4 2025 – Q2 2026 from the firm’s own site visits.